EconDefense
Record-specific actor routing

Follow through on IND-38

USACE district real-estate/construction offices; NAVFAC real-estate and facilities engineering commands; AFCEC installations/facility engineering directorates

This preserves the record’s role labels; it is not an additional verified institutional directory node.

Authority holder · recorded legal basis

Secretary concerned

Executing office · routing lead

USACE district real-estate/construction offices; NAVFAC real-estate and facilities engineering commands; AFCEC installations/facility engineering directorates

Recorded executing role; this record-specific route is not an additional institutional office.

Intake

Use the responsible program or contracting office for this instrument.

The recorded role is not itself a general application endpoint.

What this role does not control

A routing lead does not establish funds, an individual delegation or approval of the proposed action.

Legal basisSources linkedLegal sources and instrument limits are recorded.
RequirementsGates recordedRead the requirements for this instrument; applicability depends on the proposed action.
Public fundingRules recordedThe record states funding rules and conditions; no program amount is attributed to this action.
Assigned rolesRoles recordedPublic sources describe institutional authority. The instrument identifies approval and execution roles; a specific signature remains transaction-dependent.
EngagementRole recordedRecorded executing role: USACE district real-estate/construction offices; NAVFAC real-estate and facilities engineering commands; AFCEC installations/facility engineering directorates. Use the responsible program’s process.

Selected instrument

IND-38 · Facility repair

Repair or convert existing facilities with O&M funds

Restore existing facilities or convert their use without enlarging external dimensions.

What this is not / limit: Cannot build new facilities or additions under repair authority

Executing role: USACE district real-estate/construction offices; NAVFAC real-estate and facilities engineering commands; AFCEC installations/facility engineering directorates

Authority holder

Secretary concerned

Eligibility gate

  • Major repair approval and report over $7.5M
  • All phases count toward total project cost
  • Force-structure consistency and repair/replacement cost assessment

Funding condition

  • O&M appropriations; no evasion of construction rules by relabeling new construction as repair.

All recorded limits

  • Cannot build new facilities or additions under repair authority
  • If repair exceeds 75% replacement cost, explain why replacement is not preferred
Other statutory tools
Legal basisSources linked
RequirementsGates recorded
Public fundingRules recorded
Assigned rolesRoles recorded
EngagementRole recorded
Actor sources & routing basis

Recorded executing role; this record-specific route is not an additional institutional office.