EconDefense
IND-17 / Industrial capacity, capital and credit

Qualify substitutes, restrict sourcing to reliable sources and create reserves

Support material/component substitutes and production incentives; use reliable-source restrictions, stockpiles, reserves and lead-time planning. Excess acquired materials may transfer to National Defense Stockpile without acquisition reimbursement.

Authority / instrument · IND-17

Industrial supply resilience

Industrial capacity, capital and credit

Statute & instrument
Authority holder

Secretary of Defense

What this does not authorize / hard limit

No blanket waiver of acquisition restrictions

Recorded executor

WIRE/IBAS program and assigned warranted contracting or agreements officer

Continue to actor →

Recorded executing role; this record-specific route is not an additional institutional office.

Legal basisSources linkedLegal sources and instrument limits are recorded.
RequirementsGates recordedRead the requirements for this instrument; applicability depends on the proposed action.
Public fundingRules recordedIndustrial Base Fund appropriations; Pub. L.119-60 §867(b) bars using funds made available BEFORE Dec.18,2025 for newly added §4817(g)–(j) activities. FY27 CR limitations independently apply to its funds. Office budget figures are separate institutional context, not an allocation to this instrument.
Assigned rolesRoles recordedPublic sources describe institutional authority. The instrument identifies approval and execution roles; a specific signature remains transaction-dependent.
EngagementRelated evidenceThe related WIRE qualification process is documented, while the new substitute/reserve/stockpile-transfer mechanism still needs a specific legal and transactional link. Program check: 2026-10-04; see each route for intake status.

Public evidence describes the institution and instrument; it is not approval of an individual transaction.

At a glance

Possible toolIND-17 · Other statutory tools

Authority holder: Secretary of Defense

Other statutory tools

Mechanism tags describe the source text; they do not expand the authority.

Availability and verification

Conditional legal pathway; current funding, required determinations, and actual delegation not certified.

Program process and intake

Checked 2026-10-04 · process documented. Program evidence is separate from legal authority, available funds and transaction approval.

The related WIRE qualification process is documented, while the new substitute/reserve/stockpile-transfer mechanism still needs a specific legal and transactional link.

WIRE mineral qualification/prototype call — related process

Who this route serves
Consortium applicants for listed mineral capabilities; not reserve-transfer requesters.
Administering office / routing lead
IBP/WIRE; WHS/AD administers DIBC agreement with ATI.
Related process

IBAS is expressly identified, but the call does not establish exercise of § 4817(i)(5)–(6)/(j).

What this evidence label means
Historical closed call

RPP provides industrial capability process evidence; no specific new substitute/reserve-transfer award is identified.

Status reference date: 2026-10-04 · research checked 2026-10-04

DIBC critical minerals RPP-CM-26-02 · PDF pp2–4,11; IBAS/DPA tests and mineral AOIsofficial solicitation · published 2026-08-21 · Evidence record

Program eligibility

Steps and preparation

Funding, limits and authority relationship

Funding and financial terms

  • statutory funding-vintage restriction · Post-December 18, 2025 funds

    Funds made available before December 18, 2025 cannot be used for the new§ 4817(g)–(j) activities.

    Public Law119-60 FY 2026 NDAA · § 867, new10 USC4817(g)–(j) and fund-vintage restrictionstatute · published 2025-12-18 · Evidence record

Exclusions and limits

  • New reserve/transfer powers retain reliable-source, defense-interest and incidental-cost rules; a qualification prototype does not establish those separate determinations.

    Public Law119-60 FY 2026 NDAA · § 867,added§ 4817(i)(5)–(6),(j)statute · published 2025-12-18 · Evidence record

Authority relationship source

DIBC critical minerals RPP-CM-26-02 · PDF pp2–4official solicitation · published 2026-08-21 · Evidence record

Closed mineral RPP →

closed solicitation reference: Qualification/supply-chain process only; not a verified new§ 4817 reserve action.

Source access and verification notes
  • WIRE program (Access not verified) · Mission; Industrial Base Fund/DPA; consortium execution routesofficial program guidance · Evidence record

    Automated direct retrieval did not complete on October 4, 2026. This access check does not establish current legal effect or invalidate independently reviewed indexed evidence; see the cited location and this dossier’s access qualifications.

Research scope and sources checked

Searched businessdefense.gov for4817+substitutes/reserves; reviewed full mineral RPP and new§ 867text; rejected DLA recycling as proof of separate IBF powers.

What remains unverified

  • No post-enactment reserve establishment, reliable-source restriction or excess-material transfer explicitly under these new subsections was found.

A dated source check is not continuing monitoring. Recheck the linked official notice before preparing a submission. Browse program research →

Requirements and limits

Eligibility & prerequisites

  • Enumerated §4817(g)(1) defense supply-chain purposes; other purposes require essentiality/timeliness findings and 30-day report
  • No activity in the six covered countries under §4817(m)
  • Applicable approval and award instrument
  • Reliability definition in §4817(m)(2); national-security finding for substitutes
  • Public-interest determination for excess transfer
  • Additional statutory coverage: reliable-source restriction, critical-component reserve, and substitute-development paths under DPA §107.

Limits & exclusions

  • No blanket waiver of acquisition restrictions
  • Incidental transfer costs paid/reimbursed by receiving stockpile/reserve
  • New provisions sunset Dec.31,2035
  • Incentives use Title III or other statutory authority; this section is not a general standalone appropriation or grant.
  • DPA termination/extension and appropriations restrictions must be read with existing IND records.

Funding conditions

  • Industrial Base Fund appropriations; Pub. L.119-60 §867(b) bars using funds made available BEFORE Dec.18,2025 for newly added §4817(g)–(j) activities. FY27 CR limitations independently apply to its funds.

Read the funding and execution guide

Who contributes what

Need & planning

  • USD(A&S) / Industrial Base Policy / Industrial Base Resilience / WIRE
    Office profile
  • Military Department and COCOM requirement sponsors
    Office profile

Resources

  • Industrial Base Fund / IBAS program
  • DoD Comptroller and component funding sponsors
    Office profile

Approval

Execution

  • WIRE/IBAS program and assigned warranted contracting or agreements officer
    Office profile

Partners & review

  • Industry / eligible intermediaries
  • DoD General Counsel and fiscal counsel
    Office profile

Office links are editorial matches to the original role text, not verified delegations. Composite labels and unmatched actors are preserved.

Coordination pathway

Requirement sponsor → named planning office → resource owner and counsel → statutory approving official → authorized executing/contracting office.

Actor and execution-role sources

October 5 statutory review

October 5 review adds adjacent statutory coverage: 50 U.S.C. §4517. reliable-source restriction, critical-component reserve, and substitute-development paths under DPA §107.

Section coverage and review findings

What this research establishes

Legal basisSources linkedLegal sources and instrument limits are recorded.
RequirementsGates recordedRead the requirements for this instrument; applicability depends on the proposed action.
Public fundingRules recordedIndustrial Base Fund appropriations; Pub. L.119-60 §867(b) bars using funds made available BEFORE Dec.18,2025 for newly added §4817(g)–(j) activities. FY27 CR limitations independently apply to its funds. Office budget figures are separate institutional context, not an allocation to this instrument.
Assigned rolesRoles recordedPublic sources describe institutional authority. The instrument identifies approval and execution roles; a specific signature remains transaction-dependent.
EngagementRelated evidenceThe related WIRE qualification process is documented, while the new substitute/reserve/stockpile-transfer mechanism still needs a specific legal and transactional link. Program check: 2026-10-04; see each route for intake status.

Confidence: High on statutory permission; execution roles are organizational routing, not verified individual delegations.

Currentness: Full enacted Pub. L.119-60 §867 read, corroborated by OLRC §4817 prelim; new (g)–(m) provisions sunset Dec.31,2035; five-year third-party award subauthority is shorter.

Review scope: Original research target October 2, 2026; no record-specific last-review date supplied. Publication is not legal-currentness certification.